{
  "version": 1,
  "brief": "Implement only the customer-value and simple-operations direction documented in HANDOFF.md section 2 as one validation-coupled productization goal. Reuse the existing dual-coach domain, Korean copy generation, canonical events, adaptive journals, approval capabilities, and reservation-first delivery. Deliver: (1) a registered-customer daily customer-safe projection ordered as state, prior comparison, locked judgement, reason, one-to-three actions, and next check; (2) append-only operator-approved action/next-check/outcome continuity projected from existing canonical events and approved proposal identities, without a separate AI memory store; (3) a typed weekly customer review source using the existing weekly summary and existing operator approval/delivery lifecycle, never direct scheduled customer delivery; (4) a simplified normal Topic 59 card that hides revision/digest/epoch/recovery details, exposes edit/hold/explicit approve-and-send, and orchestrates existing approve, activate, delivery-enable, reservation, provider, receipt, and audit APIs with fresh revalidation at every boundary; (5) approved edits as immutable child revisions requiring reapproval; (6) bounded customer-safe error copy while operator diagnostics retain details. Existing Korean wording generation is authoritative: do not invent a parallel copy engine. Preserve exact customer/trainer/operator isolation, append-only history, full-event recovery equality, policy triple revalidation, no AI auto-send, provider-at-most-once, and fail-closed behavior. Scope stop: no dashboards, detailed calendars, extra alerts, customer scores, new speculative AI logic, parallel stores, broad refactors, live provider calls, activation, raw data edits, or unrelated changes. Verification must cover daily/weekly product shapes, action-to-outcome continuity, child-revision reapproval, approve-and-send stop points, stale authority/policy pins, unknown provider outcome, and no duplicate send. The product direction plus prior source-level architecture assessment are sufficient acceptance criteria; this is one validation-coupled feature stack and does not require a separate Ralplan round.",
  "gjcGoalMode": "aggregate",
  "gjcObjective": "Complete the durable ultragoal plan in .gjc/ultragoal/goals.json, including later accepted/appended stories, under the original brief constraints; use .gjc/ultragoal/ledger.jsonl as the audit trail.",
  "goals": [
    {
      "id": "G001",
      "title": "Implement only the customer-value and simple-operations direction documented ...",
      "objective": "Implement only the customer-value and simple-operations direction documented in HANDOFF.md section 2 as one validation-coupled productization goal. Reuse the existing dual-coach domain, Korean copy generation, canonical events, adaptive journals, approval capabilities, and reservation-first delivery. Deliver: (1) a registered-customer daily customer-safe projection ordered as state, prior comparison, locked judgement, reason, one-to-three actions, and next check; (2) append-only operator-approved action/next-check/outcome continuity projected from existing canonical events and approved proposal identities, without a separate AI memory store; (3) a typed weekly customer review source using the existing weekly summary and existing operator approval/delivery lifecycle, never direct scheduled customer delivery; (4) a simplified normal Topic 59 card that hides revision/digest/epoch/recovery details, exposes edit/hold/explicit approve-and-send, and orchestrates existing approve, activate, delivery-enable, reservation, provider, receipt, and audit APIs with fresh revalidation at every boundary; (5) approved edits as immutable child revisions requiring reapproval; (6) bounded customer-safe error copy while operator diagnostics retain details. Existing Korean wording generation is authoritative: do not invent a parallel copy engine. Preserve exact customer/trainer/operator isolation, append-only history, full-event recovery equality, policy triple revalidation, no AI auto-send, provider-at-most-once, and fail-closed behavior. Scope stop: no dashboards, detailed calendars, extra alerts, customer scores, new speculative AI logic, parallel stores, broad refactors, live provider calls, activation, raw data edits, or unrelated changes. Verification must cover daily/weekly product shapes, action-to-outcome continuity, child-revision reapproval, approve-and-send stop points, stale authority/policy pins, unknown provider outcome, and no duplicate send. The product direction plus prior source-level architecture assessment are sufficient acceptance criteria; this is one validation-coupled feature stack and does not require a separate Ralplan round.",
      "status": "complete",
      "createdAt": "2026-07-29T09:50:40.824Z",
      "updatedAt": "2026-07-29T11:33:52.302Z",
      "pipelineMetadata": {
        "schemaVersion": 1,
        "goalId": "G001",
        "source": "legacy_brief_only",
        "eligible": false,
        "dependsOn": [],
        "independentOf": [],
        "targets": {
          "files": [],
          "surfaces": []
        },
        "overlap": "none",
        "invalidationReason": "missing_pipeline_metadata",
        "metadataHash": "ee22f050202eddb1df159edbc575f74df1661c7cce97b7394afe3f786d576e94"
      },
      "startedAt": "2026-07-29T09:50:46.477Z",
      "completedAt": "2026-07-29T11:33:52.302Z",
      "evidence": "Customer-value productization complete: final Architect CLEAR/APPROVE and terminal Critic OKAY; profile broad 302 passed; gateway lifecycle 12, exact card 1, publication recovery/no-retry 3 passed; pycompile, ruff, diff checks, and secret scans passed; no live/provider actions.",
      "completionVerification": {
        "schemaVersion": 1,
        "receiptId": "473f6231-4607-46fc-b1b1-7fb40592a97c",
        "verifiedAt": "2026-07-29T11:33:52.302Z",
        "goalId": "G001",
        "receiptKind": "final-aggregate",
        "goalStatusBeforeCheckpoint": "active",
        "gjcGoalMode": "aggregate",
        "gjcObjective": "Complete the durable ultragoal plan in .gjc/ultragoal/goals.json, including later accepted/appended stories, under the original brief constraints; use .gjc/ultragoal/ledger.jsonl as the audit trail.",
        "qualityGateHash": "8f6dbdf03b0dd89f42ea53cd07cbf8d4ac50f70ddab5ef6ee86a49422ec2f9e6",
        "planGeneration": "726456e841db0c2304233473ffbc1aa768403a11674530c9108ba159748f3724",
        "basis": {
          "planHashBeforeCheckpoint": "1819303ef22f2f1a5d965bc4b24b6e44af9d5c6df423c63a3e37b0a465f93ef0",
          "latestRelevantLedgerEventIdBeforeCheckpoint": "cde1438b-5b1b-4746-865d-77c54096486c",
          "goalUpdatedAtBeforeCheckpoint": "2026-07-29T11:33:52.302Z",
          "relevantGoalIdsBeforeCheckpoint": [
            "G001"
          ],
          "requiredGoalSetHashBeforeCheckpoint": "cf39c49f5642629e03fecd256008a0144d0949b36f1028163952dc2fad88673c"
        },
        "checkpointLedgerEventId": "14f517af-8731-4bbe-b0b5-93ca140019ac"
      }
    }
  ],
  "createdAt": "2026-07-29T09:50:40.824Z",
  "updatedAt": "2026-07-29T11:33:52.302Z",
  "repositoryBinding": {
    "schema": "gjc.repository_binding.v1",
    "worktreeRoot": "/home/cube/projects/richard/traning coach",
    "commonDir": null,
    "displayPath": "/home/cube/projects/richard/traning coach"
  },
  "state_revision": 12
}
